case studies

Biwater brings its competitive combination of technical excellence, project management expertise and independent financial strength to every project the company undertakes, assuming the role of partner rather than simply a supplier or contractor.

location


category


case study list

Florida
Design and construction of a 18 MGD membrane treatment plant

Florida
This Biwater AEWT plant is very unique. It is one of the earliest designed plants to use nanofiltration membrane technology to allow the city of Boca Raton to meet the federal and state water environmental requirements.

Florida
Biwater AEWT has successfully completed the first phase of acceptance testing for the first five skids of ten 2.55 MGD membrane softening capacity.

Florida
Biwater AEWT designed, supplied and constructed six reverse osmosis desalination skids at Collier County’s reverse osmosis water treatment plant.

Florida
Biwater AEWT (BAEWT) has been awarded a contract to Design and Supply the Lake Region Water Treatment Plant with a Reverse Osmosis (RO) Membrane Treatment System.

Florida
Biwater AEWT (BAEWT) has been awarded a contract through the general contractor, Wharton Smith, to supply a Reverse Osmosis (RO) water treatment expansion system to the City of Deerfield Beach.

Florida
’12.0 MGD Supply of Clean Water for the City of Ft. Lauderdale’ Based BAEWT’s advanced membrane separation technology and experience, the RO Membrane System is configured as four RO units, each with a permeate capacity of 3.0 MGD.

Florida
BAEWT is one of the premier manufacturers of large capacity systems for the production of high purity drinking water using state of the art membrane separations technology.

Florida
BAEWT strives to provide the highest quality water through state-of-the-art membrane systems.