case studies

Biwater brings its competitive combination of technical excellence, project management expertise and independent financial strength to every project the company undertakes, assuming the role of partner rather than simply a supplier or contractor.

location


category


case study list

Texas
Turnkey construction of El Paso membrane treatment plant

Florida
Design and construction of a 18 MGD membrane treatment plant

Florida
Biwater AEWT designed, supplied and constructed six reverse osmosis desalination skids at Collier County’s reverse osmosis water treatment plant.

Texas
Biwater AEWT (BAEWT) has successfully been awarded the contract for the design, supply, and refurbishment of the water treatment system for the Brazos River Authority (BRA) Surface Water And Treatment System (SWATS) 5th RO Unit Project.

California
With a constant need for clean water, this will be an important step in allowing the City of Simi Valley to diversify their water resources.

Florida
Biwater AEWT (BAEWT) has been awarded a contract to Design and Supply the Lake Region Water Treatment Plant with a Reverse Osmosis (RO) Membrane Treatment System.

Florida
Biwater AEWT (BAEWT) has been awarded a contract through the general contractor, Wharton Smith, to supply a Reverse Osmosis (RO) water treatment expansion system to the City of Deerfield Beach.

Florida
’12.0 MGD Supply of Clean Water for the City of Ft. Lauderdale’ Based BAEWT’s advanced membrane separation technology and experience, the RO Membrane System is configured as four RO units, each with a permeate capacity of 3.0 MGD.

Florida
BAEWT is one of the premier manufacturers of large capacity systems for the production of high purity drinking water using state of the art membrane separations technology.

Florida
BAEWT strives to provide the highest quality water through state-of-the-art membrane systems.